Completed Projects

Kitchen

  • removed asbestos texture from ceiling, reclaiming 10' ceiling height
  • removed peninsula with range and fridge
  • removed carpet to uncover original wood floors
  • removed drywall, exposing plaster and original trim reveal
  • re-opened doorway between dining room and living room
  • removed asbestos tile from pantry, opened up pantry door and wall
  • cased new openings with reclaimed trim from pantry wall
  • installed beadboard

Bathroom

  • removed floor tile, exposing hardwood underneath

Master Bedroom

  • removed asbestos floor tile
  • in the process of adding a DIY backband to all the trim to reclaim the reveal lost to drywall over plaster

Living Room

  • electrical
  • insulation
 

Instagram Feed

follow me @rethavictorian